project house {week 16}

_DSC4493_DSC4496_DSC4497_DSC4498_DSC4494_DSC4499

{window trim & picture rail in stairwell // trim in stairwell // stairs covered & ready for painting // sadie’s dog door installed // trim around doorway in entry // window trim & trim in stairwell}

_DSC4500_DSC4501_DSC4503_DSC4505_DSC4502_DSC4504

{floors downstairs prepped for painting // master bath vanity waiting for installation // sadie’s dog crate & under the stairs closet // office window trim // hinges are up // down the hall towards our master bed & bath}

_DSC4506_DSC4507_DSC4509_DSC4510

{floor & trim patching in the kitchen // trim patching in living room // doorway trim in living room // stair hand rails ready for installation & painting}

last week all of the millwork – trim – went in & it all looks great! we have pretty traditional craftsman style trim in the upstairs that we wanted to continue into the new space. the picture rail was continued into the entryway & stairwell, but not anywhere downstairs; it may be something we add to the master bedroom perhaps at some point in the future but since the ceilings are almost a foot lower downstairs, we decided to hold off on putting picture rail thru-out the new space. the hinges are also all installed & the doors are ready to be hung & just waiting for hardware.

this week we will have interior painters in, starting with touch up in the upstairs spaces – kitchen, living room – & continuing on to paint the new space. lots of people have asked about paint colors & then I think are a little disappointed in my answer. most of the new space – entryway, stairwell, laundry room, hallway, office, nursery, kids’ bath, & master bath – will all be simply white by benjamin moore. the master bedroom will be revere pewter by benjamin moore. under other circumstances {mostly not being almost due with baby!} I probably would have chosen an actual color palette to save aaron & me the work of later needing to paint any walls. however, I went with white because I knew it would be a safe choice & a good canvas for any future color. I do have color plans for the rest of the space, including painting the ceiling of the kids’ bath {like this} & painting stripes on the nursery ceiling, so no worries!

like I mentioned last week, we are going to start moving into the house slowly starting this weekend. I don’t know if we are more excited or nervous! there is so much stuff packed into our living room right now {though our contractor will clear out his stuff} & there is more stuff to fit in there, like the crib, dresser/changing table, & other baby necessities. if that doesn’t sound like a good nesting project {except for moving the really heavy stuff} I don’t know what is!

M

project house {week 15}

_DSC4467_DSC4470

_DSC4468

_DSC4469

{gutters! // extra storage under the front stairs // east side fence // west side fence}

**I realize every picture shows the house a different color – the first one with the fence is the most accurate**

_DSC4472_DSC4475

_DSC4471

_DSC4473

_DSC4474

{floors in the upstairs entry & hallway // floor panel in closet under stairs // floors in entryway // stairs & landing // stairs & downstairs floor}

_DSC4477_DSC4482

_DSC4481

{penny tile in kids’ bath! // doors // subway tile & marble in master shower}

_DSC4479

_DSC4478_DSC4480

{master bath floor // master bath shower // subway tile}

this past week all of the flooring was basically completed – salvaged wood floors upstairs were stained & conditioned {first round}, stairs were completed with new fir – stained & conditioned, & tile in the bathrooms was grouted. it is looking so amazing!

up this week: hanging doors & installing millwork! for both of these elements we are trying to keep true to the original craftsman style in the house, & having 5 panel doors & simple, thick trim with quarter-round.

as for timeline {which is everyone’s question these days!}: we are planning on moving into the main level {living room, kitchen, bath, & bedroom} in a week & a half, & the entire project is slated to be finished sometime the week of august 18th. not ideal I know since baby lower is due on august 12th, but there really isn’t much we can do {trust me, I’ve asked!}. all of this finish work takes a lot of time! & for those of you wondering, nope, I won’t get to set up the nursery until after the house is done. that means setting up baby’s nursery furniture in the living room for now so that its ready to move downstairs as soon as we get the greenlight – anyone want to help?

M

my weekend in pictures.

WP_20140712_12_49_35_Raw

{at our childbirth class this weekend we learned about how baby lower will navigate the pelvic bones – pretty crazy stuff!}

IMG_5017

{sadie & my 35 week bump!}

IMG_5018

{in the middle of a diy project for the house & so excited about it!}

IMG_5019

{fro-yo doesn’t doesn’t last long around here when its 90 degrees. & there is no A/C.}

IMG_5021

{a much-needed car wash!}

IMG_5022

{admiring the gorgeous salvaged wood floors at the house. more pics to come on thursday!}

IMG_5023

{we dined in west seattle with some friends & enjoyed the view of the seattle city skyline.}

IMG_5024

{tried marination ma kai – a food truck turned restaurant – & it was awesome. there wasn’t shave ice since the freezer was out which was a bit of a bummer. 90 degrees + pregnant misha = wants shave ice}

IMG_5025

{walking out of whole foods this evening the sky was breathtaking!}

this weekend was hot, hot,, hot! a lot of you can easily do high 80s or low 90s without breaking a sweat {pun intended!} but I know you are doing it with A/C. I was able to make it most of the day, but by about 5 or 6 I was ready to be cooled down. luckily both mornings this weekend we attended a childbirth & breastfeeding class at swedish hospital – it was not only very informative but had A/C! I am gearing up for my last two weeks of work before I start my leave {!} & looking forward to enjoying some summer before baby lower joins the fam {though a bit cooler would be more pleasant!}. how was your weekend?

M

project house {week 14}

_DSC4431_DSC4432_DSC4433_DSC4436

{flooring down in the entryway // which stain {um, left!} // dry wall patching in living room // entryway & front door}

_DSC4434_DSC4435_DSC4437

{stairwell windows taped off for primer & paint // entryway primed // new fir on the stair landings}

_DSC4446_DSC4438

{master bath shower bench tiled // second stair landing}

_DSC4439_DSC4443_DSC4448_DSC4442

{stair riser // new hardwood floor acclimating // downstairs hallway // tankless water heater & boiler system – who knew we were getting a spaceship in the house?}

_DSC4444_DSC4447_DSC4452

{wet saw & subway tile for the master bath // marble down on the master bath floor // new exterior paint!}

work is coming along, slowly but surely. lots of big things happening now with flooring being the main focus these days. salvaged fir floor was put in the entryway which will need to be sanded & stained (hopefully to match the existing main level floor). tiling has started downstairs in the master bath & shower with the kids’ bath floor to follow (soon, I hope!). the new floor is acclimating in the house now for the remainder of the basement – engineered hardwood due to radiant heat in the floor (new wood floor is subject to warping with radiant heat apparently).

I have probably said this before, but man the finish work takes for. ever. it seems like we are so close, yet so. far. away.

M

my {long holiday} weekend in pictures.

IMG_4981

{me & the bump celebrating the 4th of july.}

IMG_4982

{the land of nod store is under construction & has a pretty fun entryway right now.}

IMG_4985

{sadie’s new dog door at the house. pics to come later in the week of the rest of the house!}

IMG_4986

{we attended a very patriotic party to celebrate america’s birthday.}

IMG_4987

{the annual 4th of july parade in our neighborhood. such a treat!}

IMG_4988

{we stopped by to see andy & hailey, & sadie loved sleeping in the grass lake-side.}

IMG_4989

{sadie insisted on sitting right in between us during a small fireworks show. she didn’t last long before she wanted to be inside away from the noise. poor kid.}

IMG_4990

{we went to ikea to pick up a few things for the house. #nesting}

IMG_4991

{& amazingly it all fit in our car! sadie & I shared a seat in the back, but it worked. thank goodness we have a hatchback!}

IMG_4994

{I finally found some time to finish up a sewing project for baby lower that I started some time ago. hope to share pics soon.}

IMG_4998

{due to the many residual fireworks over the weekend, sadie got to sleep in bed with us. she hated it, obviously.}

what an awesome weekend. can every weekend be a three-day weekend, seriously? we got to sleep in, see lots of friends & family, & check some things off the ole’ to-do list – doesn’t get much better than that. we were a bit disappointed in the weather this weekend {rain when it wasn’t actually forecasted} but it is definitely feeling like summer here in the emerald city. I am still in shock that we are already so far into july – slow down summer!

how was your weekend?

M

project house {week 12}

_DSC4371_DSC4372_DSC4373_DSC4384_DSC4385_DSC4383_DSC4387_DSC4386_DSC4388_DSC4389

{sadie laying in dry wall dust // dry wall! // basement hallway // entryway // doorway to living room & front door // stairwell windows // ceiling patching in kitchen // doorway from living room to kitchen // salvaged hardwood to patch upstairs flooring // aaron in upstairs hallway}

_DSC4390_DSC4395_DSC4393_DSC4391_DSC4394_DSC4400_DSC4401_DSC4397_DSC4399_DSC4396

{raised ceiling & attic access in upstairs hallway // sewer ejection pump in closet under stairs // stairwell // small ledge in stairwell // sadie’s built-in crate under stairs // basement hallway // art niche in master bedroom // kids’ bathroom // tray ceiling in master bedroom // bedroom window}

WP_20140622_18_30_27_RawWP_20140622_18_28_45_RawWP_20140622_18_28_38_RawWP_20140622_18_29_23_RawWP_20140622_18_29_55_Raw

{ceiling in upstairs hallway // entryway & stairwell // stairwell & upper hallway // living room // kitchen ceiling}

WP_20140622_18_28_58_RawWP_20140622_18_30_57_RawWP_20140622_18_30_14_RawWP_20140622_18_30_39_RawWP_20140622_18_31_50_Raw

{dry wall in the entryway // stairwell // upstairs hallway // stairwell // master bedroom & bath}

lots of progress has been made in the past few weeks – electrical & plumbing rough-in was completed & inspected, & dry wall has been installed. the exterior is also being prepped for a new paint job. {sidenote: we had to paint the new siding that went up on the house so instead of just painting it the same color as the rest of the house – tan – we decided to have the entire house painted. it seemed like a waste to pay someone to paint the new part of the house a color that I really didn’t like. why not pay a little more & have the whole thing a new color?}

as you would expect, the downstairs spaces seem much smaller now that the walls have been closed in. smaller, but still feels great! it is nice to see the rooms come to life, finally! next up is taping & mudding of the walls, & flooring {hardwood & tile}. we are meeting with our GC for a walk-thru at the end of the week & I think we are both really excited to chat about the work that is going on, ask lots of questions, & determine what the updated timeline is & what we can expect.

dry wall is up – thoughts?

M

my weekend in pictures.

WP_20140620_20_24_47_Raw

{got to attend jaz’s dance recital on friday night. such a treat! great job kiddo!}

IMG_4950

{I had the pleasure of hosting a baby brunch for amanda & baby boy sadlier at steelhead diner on saturday afternoon. more pics to come this week!}

IMG_4951

{traffic was awful this weekend going to seattle & in the city. the 520 bridge was closed & streets all over the city were closed for the half and full marathon.}

IMG_4952

{not usually a fast food eater but I did have to try a wendy’s frosty in a waffle cone. so good!}

IMG_4953

{we got to hang out with jaz on saturday night while her parents went on date night. lots of games were played!}

IMG_4954

{I bust out the iron only for special occasions. this occasion was maternity photos.}

IMG_4955

{lots of hair products used by the gal at swink style bar while getting my hair done.}

IMG_4956

{stopped by the house this weekend to see the progress & DRYWALL! pics to come later in the week.}

IMG_4957

{sadie enjoying the new almost finished space in our basement.}

we had a very busy first-of-the-summer weekend but it was time well spent. we got to hang out with our friends jes, cale, & their daughter jaz {twice!} which is always a good time. I also got to co-host a brunch for my good friend amanda & it was so good to see her & get some girl time in. the setting wasn’t too shabby either – right in the heart of pike place market! I was able to stroll around the market ahead of time, buy some gorgeous flowers, & enjoy a delicious raspberry croissaint from le panier. we also did a maternity photoshoot this afternoon – all of us: aaron, me, sadie, & the bump! we were down at golden gardens beach park which was busy because the weather was so great. can’t wait to share these pics in a few weeks!

how was your weekend?

M

my weekend in pictures.

IMG_4927

{cutting fabric is not my forte, but it needed to be done for an upcoming sewing project for baby lower.}

IMG_4928

{aaron & I spent most of the day saturday sourcing finishes for the house – wood floors, tile, paint, light fixtures.}

IMG_4929

{a bubble tea was much-needed after making a million decisions!}

IMG_4931

{rainer cherries are in season & we have been enjoying. this was a double one – crazy!}

IMG_4932

{baby’s first set of wheels! one of the only things for baby lower that we have put together.}

IMG_4933

{oh trader joe’s. I went in for one thing & ended up with ingredients for strawberry shortcake!}

IMG_4934

{dim sum lunch with friends on sunday. so delish!}

IMG_4935

{choosing paint at benjamin moore.}

IMG_4936

{I usually don’t like the I love mommy/daddy/etc. kids’ stuff, but I couldn’t resist this to give to aaron for his first father’s day!}

we had a really busy weekend, but super productive. things are moving right along with the house & it is exciting to be finally picking finishes for everything, plus a lot of things got checked of the big to-do list which is always a great feeling!

we were really low-key about celebrating father’s day today since it really doesn’t seem like we are parents. it is crazy to think about one year from now though & how we will be parents to an almost one year old!

happy father’s day to aaron, my dad, aaron’s dad, aaron’s grandfather, & all of the other dads out there. thanks for everything that you have done for us!

how was your weekend?

M

project house {week 10}

I promised at the beginning of this renovation that I would transcribe our blueprints so that we could share them along with all of the updated pictures. I {slowly} learned how to use floorplanner.com to build our original house floor plans & our new floor plans.

image

{the original main floor}

image

{the original basement}

image

{the new main floor}

image

{the new basement}

as you can see, the main floor changed only in the office & entryway. we blew the walls out to open up the space for a big entry & set of internal stairs {we previously only had an external set of stairs & those have been filled in}. we are gaining two bedrooms, a full bath, a master suite, & a utility room – basically all of our living space will be moved downstairs & our current bedroom & bathroom will remain in tact for {out-of-town} visitors.

WP_20140610_18_54_05_RawWP_20140610_18_58_54_Raw

{front stairs are in // back deck is in}

WP_20140610_18_55_04_RawWP_20140610_18_54_56_Raw

{plumbing is nearly finished // electrical panel was moved to utility room}

WP_20140610_18_59_25_RawWP_20140610_18_59_32_Raw

{back deck stairs & new landing // our poor lawn was destroyed by building materials}

WP_20140610_18_55_26_RawWP_20140610_18_57_31_Raw

{master shower // small access for under the front steps}

WP_20140610_18_59_40_RawWP_20140610_19_19_27_Raw

{back deck & stairs // front of house}

the more intricate work of plumbing & electrical is being done & hopefully nearly finished. plus, there was so much work done to complete the front stairs & the back deck. {no more ladder at the front door!}

we met with our GC & architect to review the work so far & to discuss things like placement of electrical outlets, tile choices, paint choices, light fixture choices, & updates to the timeline. it seems a bit surreal but so amazing to see it come to life!

thoughts on the new stairs & deck?

M

project house {week 9}

_DSC4121_DSC4122_DSC4124_DSC4126_DSC4128_DSC4129

{laundry plumbing // radiant pipe ends at the future boiler // radiant pipes retrofitted under the main floor // master bedroom plumbing // front with siding // side with siding}

we are in a phase for a bit that the progress isn’t as visible – plumbing work – as it previously was. ron the plumber worked hard at installing pipes in the bathrooms & also retrofitting the main floor subfloor with radiant heat pipes so that all of the heat will be radiant in the house {no more heating vents!}. we also have house siding now. the lighter colored wood strip is a “belly band” that basically separates the old siding from the new.

I think the next up is finishing up the electrical {including inspections} & then perhaps dry wall? that will definitely be exciting!

what do you think about the update to radiant heat?

M