project house {week 9}

_DSC4121_DSC4122_DSC4124_DSC4126_DSC4128_DSC4129

{laundry plumbing // radiant pipe ends at the future boiler // radiant pipes retrofitted under the main floor // master bedroom plumbing // front with siding // side with siding}

we are in a phase for a bit that the progress isn’t as visible – plumbing work – as it previously was. ron the plumber worked hard at installing pipes in the bathrooms & also retrofitting the main floor subfloor with radiant heat pipes so that all of the heat will be radiant in the house {no more heating vents!}. we also have house siding now. the lighter colored wood strip is a “belly band” that basically separates the old siding from the new.

I think the next up is finishing up the electrical {including inspections} & then perhaps dry wall? that will definitely be exciting!

what do you think about the update to radiant heat?

M

Leave a Reply

Your email address will not be published. Required fields are marked *